IKO PolymericIKO PolymericIKO PolymericIKO Polymeric
  • Strona Główna
  • Firma
    • Historia firmy
    • Partnerzy
    • IKO w środowisku naturalnym
  • Produkty
    • Membrany Spectraplan
    • Membrany PVC
  • Projekty
    • Biblioteka zdjęć
  • Zasoby
    • Arkusze danych technicznych i broszury
    • Filmy o produktach
    • Pomoc techniczna
    • Często zadawane pytania
  • Kontakt

The Best Practices of Flat Roof Build Ups

    Home Blog The Best Practices of Flat Roof Build Ups
    NextPrevious
    inverted_roof

    The Best Practices of Flat Roof Build Ups

    By Frank Williamson FloR | Blog | Comments are Closed | 11 November, 2016 | 0

    Over the last couple of decades we have seen a steady increase in thicknesses of insulation being used in construction.  This has, however, had an impact on design in both the new build and refurbishment sector. In terms of the thermal design of a flat roof, what are the options and the best practices of flat roof build ups?

    The recognised flat roof build ups for best design practices are:

    • Cold Roof
    • Warm Roof
    • Inverted Roof

    In the case of a flat roof, insulation is usually either a rigid board above the deck, or a mineral glass/wool quilt immediately above the underdrawn ceiling, depending on the type of roof design and construction.

    warm_ballasted_roofing_system

    Cold Roof

    A cold roof construction will normally comprise of a structural deck on joists or purlins with a ceiling layer fixed to the bottom of the joists/purlins thereby creating an air layer or cavity within.

    Insulation would normally be placed in the lower portion of this void mostly sitting on or just above the ceiling structure. Depending on the type and thickness of insulation used warm moist air will be controlled accordingly preventing any or too much warm air meeting the cold air layer thus negating a condensation risk or actuality.

    A vapour control layer would ordinarily be placed at (above) ceiling level. Adequate ventilation must be provided between the insulation and the underside of the roof deck to prevent the risk of interstitial condensation forming within the void area.

    cold_roof_build_up

    A cold roof design is generally not recommended for new build roof applications due to the added requirement for roof void ventilation and the difficulties in preventing cold bridging through the system. Cold bridging occurs when there is a continuous path created through the insulation.

    If an existing cold roof is to be refurbished, consideration should be given to converting the design to a warm roof, or incorporating new insulation into the roofing system to improve thermal performance. However, if the latter is the case, thermal calculations will be required in order to analyse the likelihood of condensation risk.

    Warm Roof

    In a warm roof construction the principal insulation layer is placed above the structural decking, resulting in the structural deck and support structure being at a temperature similar to that of the building interior.

    A vapour control layer beneath the insulation is required to prevent moisture vapour being driven into the insulation through thermal pressure from within the building. The waterproofing system is placed over the insulation to completely encapsulate it.

    flat_roof_best_design_practice
    warm_roof_build_up

    Unlike a cold roof design there is no requirement for roof void ventilation. Cold bridging through the system is easier to eliminate or control as ordinarily there are no breaches from the structural supports as there is in a cold roof construction.

    Warm roof build ups can be installed on most modern construction material types such as concrete, timber and timber based sheets. They can be built up from profiled metal decks as the insulation selected would provide enough rigidity to span the open sections of such decks. However, advice should be sought if using profiled steel decks with a wider open area or “trough”.

    It is not unusual for designs to keep roof levels to a minimum and there is a trend when designing a warm roof to include some of the insulation below the structural deck as well as above.  

    There is a likelihood that this practice could contribute to a condensation risk and therefore it would be strongly recommended to have a condensation risk analysis carried out to highlight any potential issues.

    cold_warm_roof_comparison

    Inverted Roof

    An inverted roof construction sees the principal thermal insulation layer located above the roof structure and also above the waterproofing, This method results in the waterproofing, the structural deck and the support structure all being at a temperature similar to that of the interior of the building. No vapour control layer is required. A further benefit of this type of flat roof build up is that the waterproofing layer is “hidden” and thereby protected from the effects of solar gain. Given that the specially selected insulation layer is loose laid it will require ballasting to guard against wind uplift or “Floating” in wet conditions.

    inverted_roof

    The ballast would typically be round washed gravel (20mm – 40mm) or paving slabs.

    Paving gives the opportunity to use the roof as an access area for recreation or more commonly for housing service units.

    Due to the imposed loading of the ballast layer, as well as any roof mounted plant, this type of flat roof build up is generally only used for flat roof applications to concrete roof structures.

    A DOMESTIC VIEWPOINT

    In a flat roof, the waterproofing is always supported by a structural roof deck. This mostly takes the form of timber based boarding of some type, which in turn is supported on joists. The ceiling will usually be fixed directly to the underside of the joists.

    Non habitable structures such as garages would normally be un-insulated, but most roofs above the habitable part of the building will be insulated to comply with Building Regulations. In dwellings the insulation is sometimes placed immediately above the ceiling or it may be placed above the deck forming an integral part of the waterproofing system

    The construction of the roof deck and ceiling has an important effect on the behaviour of the waterproofing material on top, as does the selected placement of the insulation layer.

    At low temperatures, cold roofs are inherently prone to condensation, which can cause materials to decay and distort. To reduce this risk, through-ventilation has to be provided to each and every space above the insulation but this is often difficult to achieve; for example if the roof abuts the wall of a house.

    Cold roofs should not be endorsed for the climatic conditions in Scotland, according to the Building Standards (Scotland) Regulations. Although the Regulations do not prevent the use of cold roof constructions, warm roof constructions are recommended.

    No tags.

    Frank Williamson FloR

    Technical Manager

    More posts by Frank Williamson FloR

    NextPrevious

    Archive

    • July 2017
    • June 2017
    • May 2017
    • March 2017
    • February 2017
    • January 2017
    • December 2016
    • November 2016
    • October 2016
    • September 2016
    • August 2016
    • July 2016
    • June 2016
    • May 2016
    • April 2016
    • October 2015

    Subscribe for our blog

    KONTAKT

    ARS Poland S.C.
    Krupanka 83
    41-100 Siemianowice Śląskie
    o/Częstochowa
    Tel: +48663669559
    Email: renata.kotlarz@iko.com

    EXTRA

    • Pomoc Techniczna
    • Czesto Zadawane Pytania
    • Filmy o produktach
    Webdesign and SEO by IC Solutions
    • Strona Główna
    • Firma
      • Historia firmy
      • Partnerzy
      • IKO w środowisku naturalnym
    • Produkty
      • Membrany Spectraplan
      • Membrany PVC
    • Projekty
      • Biblioteka zdjęć
    • Zasoby
      • Arkusze danych technicznych i broszury
      • Filmy o produktach
      • Pomoc techniczna
      • Często zadawane pytania
    • Kontakt
    IKO Polymeric